IES Management College And Research Centre

PRODUCTION AND OPERATIONS MANAGEMENT (Record no. 30091)

MARC details
000 -LEADER
fixed length control field 04011 a2200193 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 130130b xxu||||| |||| 00| 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 978-93-5024-092-2
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.5
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name CHUNAWALLA, S.A.: PATEL, D.R.
9 (RLIN) 6545
245 ## - TITLE STATEMENT
Title PRODUCTION AND OPERATIONS MANAGEMENT
Statement of responsibility, etc CHUNAWALLA, S.A.
250 ## - EDITION STATEMENT
Edition statement 8
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Name of publisher, distributor, etc HIMALAYA PUBLISHING HOUSE
Date of publication, distribution, etc 1994
Place of publication, distribution, etc MUMBAI
300 ## - PHYSICAL DESCRIPTION
Extent 706
Other physical details PAPER
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Operations/Production Management-An Introduction<br/> Production Planning and Design<br/> Facilities Planning: Process Selection and Process Flow Analysis<br/> Choice of Technology<br/> Facilities Planning: Location<br/> Facilities Layout and Material Handling<br/> The Economical Size of an Industrial Unit<br/> Capacity Planning<br/> Work Design<br/> Job Design<br/> Operations/Production Planning and Control (OPC or PPC)<br/> Planning and Control for Mass Production<br/> Planning and Control of Production for Batch Production<br/> Planning and Control for Jon Shop Production<br/> Planning and Control of Projects<br/> Value Engineering or Value Analysis<br/> Managing Quality<br/> Quality Control and Improvement<br/> Equipment Replacement<br/> Maintenance Management<br/> Job Analysis, Job Description and Job Specification<br/> Job Evaluation and Compensation Plans<br/> Organization and Management of Safety in a Factory<br/> Budgetary Control<br/> Capital Budgeting<br/> Supply Chain Management<br/> Inventory Management: Independent Demand Inventory<br/> Inventory Management: Dependent Demand Inventory:<br/> Materials Requirement Planning (MRP)<br/> Stores Management<br/> Rationalised Codification System<br/> Waste Management<br/> Industrial Productivity<br/> Depreciation on Fixed Assets<br/> Costing and Cost Control<br/> Cost Accounting Systems<br/> Intangible Assets<br/> Break-even Analysis<br/> Performance Appraisal<br/> Transportation Problems<br/> Re-engineering for the 21st Century<br/> Waiting Lines<br/> Future HR Trends Relevant for Production/Operations<br/> Management Information System (MIS) and Production Management<br/><br/> Name and Subject Index<br/><br/>
520 ## - SUMMARY, ETC.
Summary, etc Before the sub-prime crisis and the consequent failure of the overleveraged US and European banks, Indian economy was growing at a healthy 9 per cent, but the slow down brought the growth rate down to 6-6.5 per cent. However, it goes to India?s credit that when most of the economies abroad were showing negative growth, we continued to grow positively. The growth rate now hovers between 7 and 7.75 per cent. Indian manufacturing sector has also shown signs of recovery. Though China too continues to grow, China earns huge foreign exchange in dollar falls, the Chinese economy with a huge dollar the US treasury bills. If the rate of dollar falls, the Chinese economy with a huge dollar pile up is likely to suffer. Indian itself is a vast market, and our economy is not totally export-oriented. Indian banking sector is regulated by the RBI, and is not allowed risky exposures.<br/><br/>Production and Operations Management is a vitally important area in a growing economy. This book explains the nuts and bolts of this subject in an easy-to-understand manner. The text is supported by supplementary materials given in boxes. The ancillary areas of purchasing, materials, stores and inventory are also covered in sufficient details.<br/><br/>As manufacturing is slowly moving from being just labour intensive, new concepts such as CAD/CAM and automation have been dealt with. Manufacturing processes and being questioned through business process re-engineering which has been discussed. OR techniques like Waiting Lines, and Transportation Models have been added. The HE and financial aspects of production have not been left untouched.<br/><br/>In short, this is comprehensive text of this subject, useful to students and practitioners.<br/><br/>
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element PRODUCTION AND OPERATIONS MANAGEMENT
9 (RLIN) 6546
856 ## - ELECTRONIC LOCATION AND ACCESS
Electronic name FREE ONLINE INSTRUCTOR AND STUDENT MANUAL
Uniform Resource Identifier <a href="www.himpub.com/manual/pcp 120">www.himpub.com/manual/pcp 120</a>
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Item type Book
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Home library Current library Date acquired Source of acquisition Cost, normal purchase price Total Checkouts Full call number Barcode Date last seen Cost, replacement price Price effective from Date last borrowed
    Dewey Decimal Classification   Not For Loan   Main Library Main Library 21/02/2013 HIMALAYA PUBLISHING HOUSE 340.00   658.5/ CHU/ PAT/ 19302 11119302 07/06/2022 425.00 21/02/2013  
    Dewey Decimal Classification       Main Library Main Library 21/02/2013 HIMALAYA PUBLISHING HOUSE 340.00 2 658.5/ CHU/ PAT/ 19304 11119304 07/06/2022 425.00 21/02/2013 07/12/2013
    Dewey Decimal Classification       Main Library Main Library 21/02/2013 HIMALAYA PUBLISHING HOUSE 340.00 2 658.5/ CHU/ PAT/ 19305 11119305 07/06/2022 425.00 21/02/2013 07/12/2013
    Dewey Decimal Classification       Main Library Main Library 21/02/2013 HIMALAYA PUBLISHING HOUSE 340.00 5 658.5/ CHU/ PAT/ 19303 11119303 07/06/2022 425.00 21/02/2013 03/12/2016
    Dewey Decimal Classification       Main Library Main Library 21/02/2013 HIMALAYA PUBLISHING HOUSE 340.00 2 658.5/ CHU/ PAT/ 19306 11119306 07/06/2022 425.00 21/02/2013 02/12/2013

Circulation Timings: Monday to Saturday: 8:30 AM to 9:30 PM | Sundays/Bank Holiday during Examination Period: 10:00 AM to 6:00 PM