IES Management College And Research Centre

Image from Google Jackets

The art of capacity planning John Allspaw

By: Material type: TextTextPublication details: Shroff Publishers and Distributors Pvt Ltd New Delhi 2008Description: xiv, 135 p PaperISBN:
  • 978-81-8404-596-3
Subject(s): DDC classification:
  • 004.36
Available additional physical forms:
  • 3657
Contents:
1. Goals, Issues, and Processes in Capacity Planning; Predicting When Your Systems Will Fail; Make Your System Stats Tell Stories; Buying Stuff: Procurement Is a Process; Performance and Capacity: Two Different Animals; The Effects of Social Websites and Open APIs; 2. Setting Goals for Capacity; Service Level Agreements; Business Capacity Requirements; User Expectations. Architecture DecisionsProviding Scaling Points; Hardware Decisions (Vertical, Horizontal, and Diagonal Scaling); Disaster Recovery; 3. Measurement: Units of Capacity; Round-Robin Database and RRDTool; Ganglia; SNMP; Treating Logs As Past Metrics; Monitoring As a Tool for Urgent Problem Identification; Network Measurement and Planning; Load Balancing; Applications of Monitoring; Storage Capacity; A real-world example: Tracking stora.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Date due Barcode Item holds
Book Book Library Annexe -2 (6th Floor) 004.36\ All\ 10914 (Browse shelf(Opens below)) Available 11110914
Total holds: 0

1. Goals, Issues, and Processes in Capacity Planning; Predicting When Your Systems Will Fail; Make Your System Stats Tell Stories; Buying Stuff: Procurement Is a Process; Performance and Capacity: Two Different Animals; The Effects of Social Websites and Open APIs;
2. Setting Goals for Capacity; Service Level Agreements; Business Capacity Requirements; User Expectations. Architecture DecisionsProviding Scaling Points; Hardware Decisions (Vertical, Horizontal, and Diagonal Scaling); Disaster Recovery; 3. Measurement: Units of Capacity; Round-Robin Database and RRDTool; Ganglia; SNMP; Treating Logs As Past Metrics; Monitoring As a Tool for Urgent Problem Identification; Network Measurement and Planning; Load Balancing; Applications of Monitoring; Storage Capacity; A real-world example: Tracking stora.

3657

There are no comments on this title.

to post a comment.

Circulation Timings: Monday to Saturday: 8:30 AM to 9:30 PM | Sundays/Bank Holiday during Examination Period: 10:00 AM to 6:00 PM