000 nam a22 4500
999 _c48892
_d48892
003 OSt
005 20180116175906.0
008 180116b xxu||||| |||| 00| 0 eng d
100 _aSonigra, S
_929223
245 _aA Case Study of Connecting Rod Manufacturing Industries to Control Big End Bore Diameter Variation
300 _a61-73 P.
520 _aThis case study highlights how a leading manufacturer of connecting rod overcomes the dimensional variation in big end bore diameter. Brainstorming exercises are conducted and matrix is prepared with Risk Priority Number (RPN). A structured action plan is implemented and discussed in detail with Failure Modes and Effects Analysis (FMEA). Four iterations are carried out with suitable implementations. It is suggested that the value of torque at the time of the second assembly of connecting rod should be maintained in the predefined range. The use of precise torque wrench is proposed to have better accuracy in an assembly operation. The present paper illustrates a real-life case study of practicing DMAIC at connecting rod manufacturing small and medium-sized enterprises.
653 _aProduction planning
653 _aManufacturing
653 _aSix Sigma;
773 0 _030422
_966983
_aMURTHY, E N
_dIUP PUBLICATION HYDERABAD
_o5557765
_tOPERATION MANAGEMENT
942 _2ddc
_cJA-ARTICLE